CAOR451 Operational Research

Operational ResearchTU Board 2023

A chair manufacturing company produces two types of chairs A and B using three machines, X, Y and Z. The time required for each chair on each machine and the maximum time available on each machine…

5

A chair manufacturing company produces two types of chairs A and B using three machines, X, Y and Z. The time required for each chair on each machine and the maximum time available on each machine for a given below:MachineTime required for each typeMaximum time availableA | BPer week in hrsX6 | 8120Y3 | 5100Z12 | 4144The profit on the A and B are rupees 500 and rupees 300 respectively. What combination of chairs should be produced to obtain maximum profit?

A worked answer is on its wayMeanwhile, read the Operational Research notes for this topic.

Discussion

Loading…

More Operational Research questions

All Operational Research old questions