AccountancyNEB 2076 (old course)

निम्न जानकारीहरू दिइएका छन्: The following informations are given: औसत प्रति घन्टा ज्याला दर (Normal wages rate per hour): Rs.200 प्रति एकाई उत्पादन गर्न लाग्ने औसत समय (Normal time per unit): 30…

2

निम्न जानकारीहरू दिइएका छन्: The following informations are given: औसत प्रति घन्टा ज्याला दर (Normal wages rate per hour): Rs.200 प्रति एकाई उत्पादन गर्न लाग्ने औसत समय (Normal time per unit): 30 minutes श्रमिकबाट उत्पादित परिमाण (Output produced by a worker): 40 units तयार गर्नुहोस् (Required):- कार्यदर प्रणाली अनुसार श्रमिकको ज्याला Wages of a worker by using piece rate system

Answer

Piece Rate CalculationDr.Cr.Total Wages = Output × Rate per unit0Rate per unit = (Wage rate × Normal time) / 600Output produced by worker0Normal wage rate per hour0Normal time per unit (30 min)0
Step-by-step calculation of piece rate wages for 40 units (Rs. 200/hour × 0.5 hours/unit = Rs. 100/unit; 40 × Rs. 100 = Rs. 8,000)

Step-by-step calculation:

  1. Determine the rate per unit under piece rate system:

  2. Calculate total wages for 40 units produced:

Final Answer: The wages of the worker under the piece rate system are Rs. 4,000.